The Project Brief

The project at Philip Southcote school involved total replacement of the existing pool canopy, replacement of the flat roof with a new Bauder roof, all new showers, WCs, DDA toilets, ventalation plant, new internal and external drainage, Altro safety floor throughout, complete rewire, new lighting to changing rooms and pool along with all new plumbing and heating to the changing room areas

Our Approach

Within the grounds of the school we set up a H&S compound to ensure the safety of all personnel on site

We installed a full scaffold over the pool area to give a safe working platform so that the roofing panels could be changed and fitted with relative ease

The old and dated changing rooms where stripped back and new mains drainage was installed to suit the new layout including the wetroom style showers, the addition of two DDA compliant WCs offered a fantastic up to date changing area for the school children

With the added improvements of fully automatic light and ventilation control to the changing rooms which where a great addition to the pool area.

Along with a new Bauder flat roof, Altro Aquarius safety flooring was laid throughout the changing rooms and around the pool side

To satisfy local building control a perimeter Acco drain was installed and connected to the local storm drainage to ease any concerns of build up of rain water around the external walls of the pool

The Outcome

The appearance of the completed works and functionality of the new enclosure, mechanical and electrical services really gave the school all of the requirements they needed to bring the pool area bang up to date

The school were kept up to date with the progress of the project and were able to decide on colour schemes to help them put their own stamp on the finished works

Shottermill Complete Kitchen

Shottermill Junior School

Kitchen Ventilation and New Bauder Roof

Shottermill Junior School

  • Service

    Kitchen Ventilation and New Bauder Roof

  • Location

    Haslemere Surrey

  • Time Scale

    10 weeks

  • Budget

    £125k

View Project
The mead complete

The Mead School

KItchen Refurbishment

The Mead School

  • Service

    KItchen Refurbishment

  • Location

    Epsom

  • Time Scale

    8 Weeks

  • Budget

    £85K

View Project
Knaphill Sinks

Knaphill Junior School

Boys WC Refurbishment

Knaphill Junior School

  • Service

    Boys WC Refurbishment

  • Location

    Knaphill Surrey

  • Time Scale

    6 Weeks

  • Budget

    £33k

View Project
outside-the-civic-centre Elmbridge

Elmbridge Civic Offices

Elmbridge Civic Offices Washroom Refurbishments

Elmbridge Civic Offices

  • Service

    Elmbridge Civic Offices Washroom Refurbishments

  • Location

    Esher, Surrey

  • Time Scale

    22 weeks

  • Budget

    £250K

View Project
219 Ruth Orange Complete

Ruth House Residential Care Home

Kitchen Refurbishments

Ruth House Residential Care Home

  • Service

    Kitchen Refurbishments

  • Location

    Woking, Surrey

  • Time Scale

    16 weeks

  • Budget

    £145K

View Project
Stockbridge Ground Floor Kitchen

Stockbridge New Build Fit-Out

New Build Internal Office Fit Out

Stockbridge New Build Fit-Out

  • Service

    New Build Internal Office Fit Out

  • Location

    Stockbridge, Hampshire

  • Time Scale

    20 Weeks

  • Budget

    £220K

View Project
Forest View - External 1

Forest View

Internal Redecoration and Flooring

Forest View

  • Service

    Internal Redecoration and Flooring

  • Location

    Basingstoke

  • Time Scale

    4 weeks

  • Budget

    £25K

View Project
Godstone Kitchen 1

Godstone Fire Station

Fire Station Internal and External Refurbishment

Godstone Fire Station

  • Service

    Fire Station Internal and External Refurbishment

  • Location

    Surrey

  • Time Scale

    12 weeks

  • Budget

    £150K

View Project
Front Elevation of Cedarwood 6&7

Cedarwood 6&7

Full M&E Refurbishment and Fit Out Works

Cedarwood 6&7

  • Service

    Full M&E Refurbishment and Fit Out Works

  • Location

    Basingstoke

  • Time Scale

    14 weeks

  • Budget

    £180K