Shottermill Junior School

  • Service

    Kitchen Ventilation and New Bauder Roof

  • Location

    Haslemere Surrey

  • Time Scale

    10 weeks

  • Budget

    £125k

Projects

Shottermill Junior School

Shottermill Complete KitchenShottermill Roof PlantShottermill Roof plant 2

The Project Brief

Following the removal of the existing suspend ceiling GE Building Services removed all of the existing redundant kitchen ventilation.

The large flat roof was replaced with a modern and insulated Bauder roof all new ventilation plant was fitted including a gas heater battery to provide tempered  air into the kitchen to work along side the extract system which was also linked into the fire alarm and roller shutter on the servery counter.

The existing 3 phase distribution boards were replaced and upgraded to current standards to allow for more capacity within the kitchen area.

Fire rated doors where fitted to the kitchen area along with new drainage to the new central cooking area, additional electric convector heaters where added to the central heating system within the kitchen.

A new suspended ceiling fitted with plastic faced ceiling tiles and modern LED panel lighting really brought the kitchen up to date.

Our Approach

A programme of works was put together in consultation with the school to enable refurbishment of the kitchen ventilation plant to bring the kitchen upto all current standards.

The first aspect of this project was to replace the roof above the kitchen area and to enable up-stands to be built to accommodate the new supply and extract ductwork.

The ventilation system was installed within the kitchen area whilst the roofing works were underway, the ventilation system was designed and future proofed for any gas appliances that may be added to the kitchen at a later date.

All new distribution boards were installed to allow greater capacity and new circuits into the kitchen.

The Outcome

The kitchen was bought upto date to provide a more pleasant working environment for the staff and to future proof any alternative appliance adjustments.

With the new roof being of insulated design this provides the added benefit of potential energy saving going forward.

The mead complete

The Mead School

KItchen Refurbishment

The Mead School

  • Service

    KItchen Refurbishment

  • Location

    Epsom

  • Time Scale

    8 Weeks

  • Budget

    £85K

View Project
Knaphill Sinks

Knaphill Junior School

Boys WC Refurbishment

Knaphill Junior School

  • Service

    Boys WC Refurbishment

  • Location

    Knaphill Surrey

  • Time Scale

    6 Weeks

  • Budget

    £33k

View Project
Philip southcote Pool Lighting

Philip Southcote School

Swimming Pool Refurbishment

Philip Southcote School

  • Service

    Swimming Pool Refurbishment

  • Location

    Chertsey

  • Time Scale

    12 Weeks

  • Budget

    £190K

View Project
outside-the-civic-centre Elmbridge

Elmbridge Civic Offices

Elmbridge Civic Offices Washroom Refurbishments

Elmbridge Civic Offices

  • Service

    Elmbridge Civic Offices Washroom Refurbishments

  • Location

    Esher, Surrey

  • Time Scale

    22 weeks

  • Budget

    £250K

View Project
219 Ruth Orange Complete

Ruth House Residential Care Home

Kitchen Refurbishments

Ruth House Residential Care Home

  • Service

    Kitchen Refurbishments

  • Location

    Woking, Surrey

  • Time Scale

    16 weeks

  • Budget

    £145K

View Project
Stockbridge Ground Floor Kitchen

Stockbridge New Build Fit-Out

New Build Internal Office Fit Out

Stockbridge New Build Fit-Out

  • Service

    New Build Internal Office Fit Out

  • Location

    Stockbridge, Hampshire

  • Time Scale

    20 Weeks

  • Budget

    £220K

View Project
Forest View - External 1

Forest View

Internal Redecoration and Flooring

Forest View

  • Service

    Internal Redecoration and Flooring

  • Location

    Basingstoke

  • Time Scale

    4 weeks

  • Budget

    £25K

View Project
Godstone Kitchen 1

Godstone Fire Station

Fire Station Internal and External Refurbishment

Godstone Fire Station

  • Service

    Fire Station Internal and External Refurbishment

  • Location

    Surrey

  • Time Scale

    12 weeks

  • Budget

    £150K

View Project
Front Elevation of Cedarwood 6&7

Cedarwood 6&7

Full M&E Refurbishment and Fit Out Works

Cedarwood 6&7

  • Service

    Full M&E Refurbishment and Fit Out Works

  • Location

    Basingstoke

  • Time Scale

    14 weeks

  • Budget

    £180K

View Project