The Mead School

  • Service

    KItchen Refurbishment

  • Location

    Epsom

  • Time Scale

    8 Weeks

  • Budget

    £85K

Projects

The Mead School

The mead completeThe mead Daz and KieranThe mead side view kitchenThe Mead Canopy Lighting

The Project Brief

This project was to refurbish the kitchen area and provide a new ventilation system upto the current standards.

The layout of the kitchen was altered by the client and the new extract canopy was designed with all of the new and existing gas cooking appliances in mind.

The kitchen was totally rewired with the addition of new lighting along with alterations to the water services throughout the kitchen which included the installation of new drainage.

All new flooring and wall cladding were also installed as part of this project.

Our Approach

These works were carried whilst the school was in operation with school meals being brought in from a neighbouring school.

A site compound was set up next the the kitchen area to enable a safe area of work and self containment for all tradesmen and enabled total segregation from the school staff and children as the kitchen was adjacent to the main school playground.

Deliveries to site were pre-arranged outside of school hours so there was no disruption or interferrance with the school day.

The Outcome

The finished project gave the school a modern and fresh kitchen area.

The project was completed within the time frame allowed and to budget.

Shottermill Complete Kitchen

Shottermill Junior School

Kitchen Ventilation and New Bauder Roof

Shottermill Junior School

  • Service

    Kitchen Ventilation and New Bauder Roof

  • Location

    Haslemere Surrey

  • Time Scale

    10 weeks

  • Budget

    £125k

View Project
Knaphill Sinks

Knaphill Junior School

Boys WC Refurbishment

Knaphill Junior School

  • Service

    Boys WC Refurbishment

  • Location

    Knaphill Surrey

  • Time Scale

    6 Weeks

  • Budget

    £33k

View Project
Philip southcote Pool Lighting

Philip Southcote School

Swimming Pool Refurbishment

Philip Southcote School

  • Service

    Swimming Pool Refurbishment

  • Location

    Chertsey

  • Time Scale

    12 Weeks

  • Budget

    £190K

View Project
outside-the-civic-centre Elmbridge

Elmbridge Civic Offices

Elmbridge Civic Offices Washroom Refurbishments

Elmbridge Civic Offices

  • Service

    Elmbridge Civic Offices Washroom Refurbishments

  • Location

    Esher, Surrey

  • Time Scale

    22 weeks

  • Budget

    £250K

View Project
219 Ruth Orange Complete

Ruth House Residential Care Home

Kitchen Refurbishments

Ruth House Residential Care Home

  • Service

    Kitchen Refurbishments

  • Location

    Woking, Surrey

  • Time Scale

    16 weeks

  • Budget

    £145K

View Project
Stockbridge Ground Floor Kitchen

Stockbridge New Build Fit-Out

New Build Internal Office Fit Out

Stockbridge New Build Fit-Out

  • Service

    New Build Internal Office Fit Out

  • Location

    Stockbridge, Hampshire

  • Time Scale

    20 Weeks

  • Budget

    £220K

View Project
Forest View - External 1

Forest View

Internal Redecoration and Flooring

Forest View

  • Service

    Internal Redecoration and Flooring

  • Location

    Basingstoke

  • Time Scale

    4 weeks

  • Budget

    £25K

View Project
Godstone Kitchen 1

Godstone Fire Station

Fire Station Internal and External Refurbishment

Godstone Fire Station

  • Service

    Fire Station Internal and External Refurbishment

  • Location

    Surrey

  • Time Scale

    12 weeks

  • Budget

    £150K

View Project
Front Elevation of Cedarwood 6&7

Cedarwood 6&7

Full M&E Refurbishment and Fit Out Works

Cedarwood 6&7

  • Service

    Full M&E Refurbishment and Fit Out Works

  • Location

    Basingstoke

  • Time Scale

    14 weeks

  • Budget

    £180K

View Project