Stockbridge New Build Fit-Out

  • Service

    New Build Internal Office Fit Out

  • Location

    Stockbridge, Hampshire

  • Time Scale

    20 Weeks

  • Budget

    £220K

Projects

Stockbridge New Build Fit-Out

Stockbridge Ground Floor Kitchenphil and steve stud workopen stud work 1st floor1st floor unfinished plaster boardStockbridge Elec DistStockbridge Elec CompleteStockbridge Fire BoardingStockbridge 1st Flr Stud

The Project Brief

Following a newly constructed warehouse building.  G E Building Services was awarded the contract to build and complete all of the internal office areas within the main building.  The works comprised of the construction of all of the internal stud partition walls with acoustic insulation and finished in tape and jointed plasterboard, specialist glazed panelling and suspended ceilings. Toshiba ceiling cassette air conditioning units fitted to the office areas with localised control.  Installation of a new switchgear and localised distribution boards to supply power to the office areas, plant and equipment including electric heating, hand dryers and external lighting.  Energy efficient LED lighting panels throughout to include fully compliant emergency lighting system. Installation of L3 fire alarm system to cover the office and warehouse areas.  Mechanical works included the installation of an unvented hot water cylinder and pipework services to the ground floor toilets and kitchen and 1st floor toilets, kitchen and shower room. Carpentry works allowed for the installation of two kitchens and a ground floor toilet cubicle system to include vanity units and concealed cisterns and all internal fire doors, architraves and skirting boards.  Decoration of all surfaces throughout, Altro Impressionist flooring to the toilets, kitchen and lobby areas and high quality carpet tiles to all other areas.

 

Our Approach

G E Building Services managed the whole project from the CDM Management element to liaising with the client on a day to day basis to adjust the scope of the project from the original based design from the Architect.  With our flexible approach we were able to implement all of the client’s wishes to enable them to have the building constructed to suit their working requirements.

The Outcome

The project was completed within budget and to the client’s satisfaction allowing them to move out of their temporary accommodation and into the new offices.

Shottermill Complete Kitchen

Shottermill Junior School

Kitchen Ventilation and New Bauder Roof

Shottermill Junior School

  • Service

    Kitchen Ventilation and New Bauder Roof

  • Location

    Haslemere Surrey

  • Time Scale

    10 weeks

  • Budget

    £125k

View Project
The mead complete

The Mead School

KItchen Refurbishment

The Mead School

  • Service

    KItchen Refurbishment

  • Location

    Epsom

  • Time Scale

    8 Weeks

  • Budget

    £85K

View Project
Knaphill Sinks

Knaphill Junior School

Boys WC Refurbishment

Knaphill Junior School

  • Service

    Boys WC Refurbishment

  • Location

    Knaphill Surrey

  • Time Scale

    6 Weeks

  • Budget

    £33k

View Project
Philip southcote Pool Lighting

Philip Southcote School

Swimming Pool Refurbishment

Philip Southcote School

  • Service

    Swimming Pool Refurbishment

  • Location

    Chertsey

  • Time Scale

    12 Weeks

  • Budget

    £190K

View Project
outside-the-civic-centre Elmbridge

Elmbridge Civic Offices

Elmbridge Civic Offices Washroom Refurbishments

Elmbridge Civic Offices

  • Service

    Elmbridge Civic Offices Washroom Refurbishments

  • Location

    Esher, Surrey

  • Time Scale

    22 weeks

  • Budget

    £250K

View Project
219 Ruth Orange Complete

Ruth House Residential Care Home

Kitchen Refurbishments

Ruth House Residential Care Home

  • Service

    Kitchen Refurbishments

  • Location

    Woking, Surrey

  • Time Scale

    16 weeks

  • Budget

    £145K

View Project
Forest View - External 1

Forest View

Internal Redecoration and Flooring

Forest View

  • Service

    Internal Redecoration and Flooring

  • Location

    Basingstoke

  • Time Scale

    4 weeks

  • Budget

    £25K

View Project
Godstone Kitchen 1

Godstone Fire Station

Fire Station Internal and External Refurbishment

Godstone Fire Station

  • Service

    Fire Station Internal and External Refurbishment

  • Location

    Surrey

  • Time Scale

    12 weeks

  • Budget

    £150K

View Project
Front Elevation of Cedarwood 6&7

Cedarwood 6&7

Full M&E Refurbishment and Fit Out Works

Cedarwood 6&7

  • Service

    Full M&E Refurbishment and Fit Out Works

  • Location

    Basingstoke

  • Time Scale

    14 weeks

  • Budget

    £180K

View Project